AUSTRALIA - LAND 129 Phase 3 Tactical Unmanned Aerial System Replacement or Enhancement

- AUSTRALIA

The current TUAS in service within Army is the Shadow 200 Version 1 (SH200 v1), operated by 20th Surveillance and Target Acquisition Regiment (20 STA Regt) and procured under Joint Project 129 Phase 2 (JP129-2). The Shadow 200 v1 is becoming obsolescent from 2019 and will be replaced by the Shadow 200 v2 in the US Army inventory. The Shadow 200 (both versions) have a number of capability shortfalls that do not support Army’s need for a deployable, amphibious, runway independent capability.
Land 129 Phase 3 will replace and enhance the existing TUAS capability. The replacement will ensure that the ADF is positioned to take advantage of the technological enhancements being made in TUAS Air Vehicle and Sensor technology. It will also ensure that there is no degradation in the Combat Brigade Commander’s combat capability due to reduced capability through Shadow 200 v1 Obsolescence.

Click for more info
Location
AUSTRALIA
Time-limit for receipt of tenders or requests to participate
Monday, October 14, 2019 12:00 AM
Language(s) in which tenders or requests to participate may be drawn up
English
Tender id
19091102
  • Join our community for FREE today!

  • Create and share your own profile

  • Join the discussions

  • Publish your own items

  • Subscription to our Weekly eNewsletter

your benefits?

Get connected with ATC Professionals Worldwide

Create your account

Sign in with LinkedIn Close

FREE membership benefits

  • * create and share your own profile
  • * join the discussions
  • * publish your own items on ATC Networkmanage news, jobs, tenders, companies, events, showcases, educations, associations and literature.
  • * subscribe to our weekly eNewsletter

Comments

There are no comments yet for this item

Join the discussion

You can only add a comment when you are logged in. Click here to login